2686_N137_bgswebsite.jpg

Cheltenham Art Gallery

Cheltenham Art Gallery

< Commercial

Client: Cheltenham Art Gallery and Museum
Main Contractor: ISG Pearce
Architect: Berman Guedes Stretton
Mechanical Contractor: Intoheat Bristol
Electrical Contractor: A R Daniels & Co.
Location: Cheltenham, Gloucestershire

This project comprised three buildings; the new build of Cheltenham Art Gallery, the refurbishment of the public
library and the refurbishment of existing services to No.51 building. 

The Art Gallery comprises 500m2 of exhibition space plus storage, workshop facilities and an education and
outreach room, café and kitchen.

MEP Engineering Solutions Ltd were appointed by the Main Contractor to assist with delivery of the M&E systems including monitoring and quality control of on-site installations, testing, commissioning and final handover.

 

Disciplines:

  • Sanitary Ware

  • Above Ground Foul and Rainwater Drainage

  • Hot and Cold Water Services

  • Mechanical Ventilation Systems

  • Natural Ventilation Systems

  • LTHW Heating Systems

  • CHW Cooling Systems

  • DX Cooling Systems

  • BMS Control Systems

  • LV Distribution

  • Lighting and Small Power

  • Security Systems and Access Control

  • CCTV System

  • Fire Detection and Alarm System

  • Data

  • Lightning Protection