IMG_3941.jpg

Hicks Gate Fire Station

Hicks Gate Fire Station

< Commercial

Client: Avon Fire Authority
Main Contractor: Willmott Dixon
Architect: Aedas Architects
Mechanical Contractor: CMB Engineering Bristol
Electrical Contractor: CMB Engineering Bristol
Location: Keynsham, Bristol

The Hicks Gate project involved the development of a 5 Appliance Fire Station and training facility adjacent to The Hicks Gate roundabout on the outskirts of Keynsham, near Bristol.

The fire station itself is a two storey building which includes offices, training / teaching rooms, quiet rooms, kitchen, mess area, gym, changing / shower rooms, WC’s and functional spaces associated with the operation of the fire station.

Training areas include a Confined Space Training barn, Fire House and Safe Working at Height tower.  

MEP Engineering Solutions Ltd were appointed by the services contractor to undertake detailed design duties.

 

Disciplines:

  • Sanitary Ware and Above Ground Drainage

  • Hot and Cold Water Services

  • Fire Fighting and Sprinkler Systems

  • Mechanical Ventilation Systems

  • Natural Ventilation Systems

  • Fume Extract Systems

  • Compressed Air Installation

  • LTHW Heating System

  • Direct Gas Fired Heating System

  • DX Cooling Systems

  • BMS Control Systems

  • Lighting and Small Power

  • Security Systems and CCTV

  • Data

  • Lightning Protection

  • Photovoltaic Systems