10gqt015.jpg

Southmead Hospital

Southmead Hospital

< Healthcare

Client: Southmead Hospital
Main Contractor: Balfour Beatty
Architect: Kendall Kingscott Architects 
Mechanical Contractor: CMB Engineering Bristol
Electrical Contractor: CMB Engineering Bristol
Location: Bristol

The Learning and Research Centre at Southmead Hospital is a joint venture between the University of Bristol and North Bristol Hospitals NHS Trust. This new facility provides CAT 2 teaching and research facilities and office accommodation for the University alongside a new Regional Quality Control Laboratory for the Trust for use by pharmaceutical departments across the South West. Research will involve testing the chemical, microbiological and physical properties of pharmaceutical products and a requirement of this work has therefore been the provision of a clean room environment.

The four storey L&R Centre is an extension to an existing building on the hospital site and as such the design has required internal refurbishment and reordering of the existing structure in order to best incorporate the new facilities which include a full height atrium, a new cafe and administration and research offices. The concrete framed structure are clad in a combination of brick and curtain walling which repeats the themes of the site-wide art strategy through feature coloured panels.

The facility is designed to meet BREEAM Excellent

MEP Engineering Solutions Ltd were appointed by the services contractor to undertake detailed design duties

 

Disciplines:

  • Sanitary Ware and Above Ground Drainage

  • Hot and Cold Water Services

  • Mechanical Ventilation Systems

  • Laboartory Services and Ventilation

  • Gas Fired LTHW Heating

  • Chilled Water System

  • Gas Supplies

  • Compressed Air and Medical Gases

  • DX Cooling Systems

  • BMS Control Systems

  • Lighting and Small Power

  • Security Systems and CCTV

  • Data

  • Lightning Protection

  • Fire Detection and Alarms

  • Door Entry Controls