Client: Notaro Care Homes
Main Contractor: Midas Construction
Architect: Boon Brown Architects
Mechanical Contractor: Keyplan Engineering Ltd
Electrical Contractor: Phaze Electrical Ltd
Location: Bridgwater
This project comprised a new purpose built 88 bed care home consisting of a 66 bedroom dementia nursing home and 12 assisted living units.
The care home is split across 2 and 3 storey building with secure landscaped gardens designed specifically for residents with dementia.
The building also provide numerous supports areas including, communal dining areas, hairdresser, resident lounges, activity rooms and cafe area
MEP Engineering Solutions Ltd were appointed by the services contractor to undertake detailed design duties
Disciplines:
Sanitary Ware and Above Ground Drainage
Hot and Cold Water Services
Mechanical Ventilation Systems
Kitchen Services and Ventilation
Laundry Services and Ventilation
Restaurant Ventilation and Air Conditioning
Gas Fired LTHW Heating
Gas Supplies
DX Cooling Systems
Fire Sprinkler System
BMS Control Systems
Lighting and Small Power
Security Systems and CCTV
Data
Lightning Protection
Nurse Call Systems
Fire Detection and Alarms
Door Entry Controls