Client: Wellsway School
Main Contractor: Cowlin Construction
Architect: DKA
Mechanical Contractor: Intoheat (Bristol) Ltd
Electrical Contractor: Fuseland Ltd
Location: Wellsway
This project is a new sports facility at Wellsway Secondary School in Keynsham.
The building contains changing for indoor and outdoor sports, a dance studio, biomechanics room and gym area. The main focus is a 6 court sports hall; viewed from the internal first floor balconies.
The construction of the building is steel frame with a mixture of external finishes including facing brickwork at low level with areas of timber and insulated render at high level. As a result the building sits well within the landscape and certainly complements the existing sports facilities.
MEP Engineering Solutions Ltd were appointed by the services contractor to undertake detailed design duties.
The project achieved Breeam Very Good status
Disciplines:
Sanitary Ware and Above Ground Drainage
Hot and Cold Water Services
Mechanical Ventilation Systems
Natural Ventilation Systems
Gas Fired LTHW Heating System
DX Cooling Systems
Combined Heat and Power Plant
Solar Thermal Installation
BMS Control Systems
Lighting and Small Power
Security Systems and CCTV
Data
Lightning Protection
Fire Detection and Alarms
Door Access and Controls